Welcome to Chuanda New Energy

 400-2562-5988

ZH / EN / JP / VT

Engineering Case

180MW POWER GENERATION PUPING TOWN ANLONG COUNTY

Release Date: April 19,2021


Aluminum alloy component frame


Our company currently has 5 fully automatic frame production lines, 2 semi-automatic frame production lines, the automatic line is expected to have a monthly production capacity of 1.2 million sets, and the manual line is expected to have a monthly production capacity of 600,000 sets. We will continue to add 3 automatic frame production lines in the future, which is expected to be realized. Monthly production capacity: 2.52 million sets of aluminum alloy frames, achieving an annual production of more than 27 million sets of aluminum alloy frames.

Back to list

Zhejiang Chuanda New Energy Co., Ltd.

  • ADDRESS

    No.6 Heping Road, Zhouwangmiao Town, Haining, Jiaxing City, Zhejiang Province

  • CALL US

    0086-57387967160

  • EMAIL

    hncdkj_danwu@hncdkj.net

  • FAX

    0573-87971598

  • ZIP CODE

    314407

Get In Touch

Click refresh

Copyright © 2021 Zhejiang Chuanda New Energy Co., Ltd. 浙ICP备2021012379号